Abstract: Based on a case study, this paper discusses the common problems that are encountered in the castinsitu pile installations by using a new static slurry drilling method in soft soils in the HarbinDalian Passenger Rail project. The solutions to the problem encountered and the recommended construction procedures are also presented in this paper.
Key words: wet rotary drill rigs, pile installation, slurry stabilization