›› 2017, Vol. 31 ›› Issue (3): 378-382.
Previous Articles
XIONG Haosen, ZHU Bin
Received:
Revised:
Online:
Published:
Abstract: The geohazards, such as, groundwater rush, collapse and excessive deformation, are frequently encountered in the tunnel excavation by Tunnel Boring Machine (TBM). These hazards might result in jam, burry and even the completely loss of TBM equipment. In order to minimize the potential risks, an advanced prediction system can be introduced in the TBM excavation to predict these adverse geological conditions and to prepare the mitigation measures. As the first application of TBM excavated tunnel in Pakistan, the tunnel for the NeelumJhelum hydroelectricity project is located at southern side of Himalaya Mountains and no previous long distance tunnel was constructed. In order to control the potential risks and geohazards, three independent advanced prediction systems, namely, Integrated Seismic Imaging System (ISIS), Tunnel Seismic Tomography (TST) and a conventional advanced prediction system, were installed in the tunnel excavation. The results demonstrated that these systems provided a large amount of useful information regarding the rock mass conditions and facilitated the tunnel excavation.
Key words: Himalaya Mountains, Tunnel Excavation by TBM, Integrated Seismic Imaging System (ISIS), Tunnel Seismic Tomography (TST), Advanced Drilling
XIONG Haosen, ZHU Bin. Geohazards Advanced Prediction System in TBM Excavation of Neelum-Jhelum Hydroelectricity Project in Pakistan[J]. , 2017, 31(3): 378-382.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://tgjc.whrsm.ac.cn/EN/
https://tgjc.whrsm.ac.cn/EN/Y2017/V31/I3/378