土工基础 ›› 2026, Vol. 40 ›› Issue (3): 535-540.

• 专题论述 • 上一篇    下一篇

跨渠道大桥工程对边坡稳定性影响分析

孙万林1,胡  波2,邱金伟2   

  1. (1.安徽省水利水电勘测设计研究总院股份有限公司,合肥 230000;
    2.长江科学院水利部岩土力学与工程重点实验室,武汉 430010)
  • 收稿日期:2025-12-15 修回日期:2026-01-12 出版日期:2026-06-30 发布日期:2026-06-25
  • 通讯作者: 胡波(1980-),男,正高级工程师,博士,研究方向为特殊土与环境岩土工程等。
  • 作者简介:孙万林(1971-),男,高级工程师,研究方向为水利工程设计和建设管理。
  • 基金资助:
    安徽省引江济淮集团有限公司科技项目资助(合同号:YJJH-ZT-ZX-20191031216,YJJH-ZT-ZX-20230118528)

Analysis of the Impact of the Cross Channel Bridge Project on Slope Stability

SUN Wanlin1, HU Bo2, QIU Jinwei2   

  1. (1.Anhui Provincial Water Resources and Hydropower Survey and Design Institute Co. Ltd., Hefei 230000;
    2.Key Laboratory of Geotechnical Mechanics and Engineering, Ministry of Water Resources, Yangtze River Academy of Sciences, Wuhan 430010)
  • Received:2025-12-15 Revised:2026-01-12 Online:2026-06-30 Published:2026-06-25

摘要: 针对跨引江济淮特大桥建设工程对渠段边坡稳定性的问题,考虑工程地质的复杂性,采用极限平衡分析方法,在主墩基坑开挖和回填工程中施加桥梁荷载、车辆荷载和地震荷载作用等工况下,对穿越位置处的渠道左岸和右岸渠坡的稳定性进行了分析研究,系统揭示了复杂地质条件下跨引江济淮工程桥梁的修建对含软弱夹层泥岩渠道边坡稳定性的影响机理与程度。计算结果表明:在现有地层和施工组织设计条件下,施工期渠道边坡安全系数大于1.2,但若在施工过程中出现降雨或其他原因导致地层中泥岩强度进一步软化降低时,渠道边坡安全系数仅为1.109,边坡安全系数的降低,说明建设跨输水渠道大桥对边坡稳定性存在不利影响,存在安全隐患。对比分析了左右岸的边坡稳定性,发现左岸边坡安全系数低于右岸边坡安全系数,这主要是因为地质情况造成的,现场地质勘查发现左岸边坡泥岩裂隙面的倾角为顺边坡,而右岸边坡泥岩裂隙面则为逆向。

关键词: 引江济淮工程, 跨渠桥梁, 边坡稳定性, 极限平衡分析

Abstract: To address the influence of constructing the cross-Yinjiang-Jihuai super bridge on the stability of canal-section slopes, and in view of the complex engineering-geological conditions, a limit-equilibrium analytical framework was employed. During the excavation and backfilling of the main-pier foundation pit, the stability of the left and right canal slopes at the bridge-crossing location was evaluated under multiple loading scenarios, including bridge loads, vehicular loads, and seismic actions. The study systematically elucidates the mechanisms and extent to which bridge construction under complex geological conditions affects the stability of canal slopes composed of mudstone containing weak interlayers. Computational results indicate that, under existing stratigraphic conditions and the current construction plan, the safety factor of the canal slopes during the construction stage exceeds 1.2. However, if rainfall or other factors induce further softening of the mudstone, the safety factor may decrease to 1.109, demonstrating that the bridge construction exerts an adverse effect on slope stability and introduces potential safety hazards. A comparative assessment of the two canal banks shows that the left slope exhibits a lower safety factor than the right. This disparity is primarily attributable to geological factors: field investigations revealed that mudstone fracture surfaces on the left slope dip in the downslope direction, whereas those on the right slope dip counter to the slope.

Key words: Water Diversion Project from the Yangtze to Huaihe River, Cross Channel Bridge, Slope Stability, Limit Equilibrium Analysis