土工基础 ›› 2026, Vol. 40 ›› Issue (2): 173-178.

• 工程实录 •    下一篇

超小净距隧道中岩柱加固稳定性分析及处治措施

王保1,苏芳彬2,许建凯3,刘赐文1,王朝国4,陈元忠4   

  1. (1.中铁广州工程局集团有限公司,广州 511466;2.中铁开发投资集团有限公司,昆明 650100;3.贵州瓮开高速公路发展有限公司,贵阳 550306;4.贵州省公路工程集团有限公司,贵阳 550001)
  • 收稿日期:2024-01-24 修回日期:2024-02-26 出版日期:2026-04-30 发布日期:2026-04-22
  • 作者简介:王保(1984-),男,高级工程师,研究方向为路桥施工。

Stability Analysis and Treatment Measures of Central Rock Pillar Strengthening in Small Clearance Tunnels

WANG Bao1, SU Fangbin2, XU Jiankai3, LIU Ciwen1, WANG Chaoguo4, CHEN Yuanzhong4   

  1. (1.China Railway Guangzhou Engineering Bureau Group Co. Ltd., Guangzhou 511466;
    2.China Railway Development and Investment Group Co. Ltd., Kunming 650100;
    3.Guizhou Wengkai Expressway Development Co. Ltd., Guiyang 550306;
    4.Guizhou Provincial Highway Engineering Group Co. Ltd., Guiyang 550001)
  • Received:2024-01-24 Revised:2024-02-26 Online:2026-04-30 Published:2026-04-22

摘要: 以翁开高速四坪隧道为工程背景,建立数值仿真模型对中岩柱稳定性进行分析,对比了在不同加固参数下中岩柱的变形及力学特征,并给出了中岩柱的注浆施工设计方案。结果表明:仅施加对拉锚杆时,中岩柱塑性区贯通,围压最大竖向沉降为10.1 mm,当同时对中岩柱注浆加固,能有效减小中岩柱塑性区范围,且当注浆加固区围岩参数提升50%后,中岩柱塑性区不再贯通,采取注浆加固措施后,拱顶沉降值均控制在1 cm内,施工安全性得到提高;左右洞初期支护在台阶连接部位弯矩均较大,应适当采取初支加强措施,保证在施工阶段支护的稳定性。

关键词: 隧道, 超小净距, 中岩柱, 注浆加固, 稳定性分析

Abstract: This paper presents the case history of Wengkai Expressway Siping Tunnel. The reinforcement measures of the central rock pillar were simulated by numerical simulation software. The deformation and mechanical characteristics of the middle rock pillar under different strengthening parameters were compared, and a grouting construction design option for the central rock pillar was proposed. The results show that when only the tension bolt is applied, the plastic zone of the central rock pillar is connected, and the maximum vertical settlement of the confining pressure is 10.1 mm. When the central rock pillar is grouted at the same time, the plastic zone can be effectively reduced, and when the surrounding rock parameters of the grouting strengthening area are increased by 50%, the plastic zone will no longer be connected. After grouting strengthening measures are taken, the settlement value of the arch top is controlled within one cm, and the construction safety is improved. The bending moment at the connection part of the steps is relatively large, and the initial support strengthening measures should be appropriately taken to ensure the stability of the support during the construction stage.

Key words: Tunnels;Small clearance, Central Rock Pillar, Grouting Strengthening, Stability Analysis

中图分类号: