浅析岩溶地区桩基施工技术措施

张 威   

  1. (中冶集团武汉勘察研究院有限公司,武汉 430080)
  • 收稿日期:2012-03-16 出版日期:2012-10-20 发布日期:2012-10-27
  • 作者简介:张威(1980-),男,工程师,一级建造师,毕业于武汉科技大学土木工程专业,研究方向为岩土工程勘察与施工工作。

Pile Installation Techniques in the Karst Terrain

ZHANG Wei   

  1. (Wuhan Geotechnical Investigation Survey and Research Institute Co., Ltd., MCC, Wuhan 430080)
  • Received:2012-03-16 Online:2012-10-20 Published:2012-10-27

摘要: 某综合楼的桩基础采用冲孔灌注桩,但该场区岩溶较发育,通过对溶洞的大小、形状及漏浆的严重性进行分析,分别采取不同的施工措施及方案,顺利完成桩基础施工,并取得了较好的技术、经济和质量效果。

关键词: 岩溶, 桩基, 技术措施

Abstract: The pile foundation of an office building was installed with Frankey technique (concrete filled driven pile). The project site is known as the welldeveloped Karst Terrain with quick sand stratum at the shallow depth. The vibration from the pile installation might trigger the ground subsidence. Different pile installation techniques were utilized for different cavity sizes, shapes and potential for the loss of cement slurry.

Key words: Karst Terrain, Frankey Pile Installation, Technical Measures