土工基础 ›› 2025, Vol. 39 ›› Issue (4): 543-547.

• 工程实录 • 上一篇    下一篇

老旧石砌挡土墙加固施工期间的安全保障措施——以佛山市某挡土墙为例

曾德鑫1,周兴龙2   

  1. (1.广东省穗安地基工程公司,广州 510000;2.广东省工程勘察院,广州 510000)
  • 收稿日期:2024-08-22 修回日期:2024-09-06 出版日期:2025-08-31 发布日期:2025-08-27
  • 作者简介:曾德鑫(1989-),男,助理工程师,研究方向为岩土工程设计与施工。

Safety Measures During the Rehabilitation Construction of Aged Masonry-Retaining Walls-A Retaining Wall in Foshan City

ZENG DeXin1, ZHOU Xinglong2   

  1. (1.Guangdong Sui’an Foundation Engineering Co. Ltd., Guangzhou 510000;
    2.Guangdong Engineering Investigation Institute Co. Ltd., Guangzhou 510000)
  • Received:2024-08-22 Revised:2024-09-06 Online:2025-08-31 Published:2025-08-27

摘要: 上世纪末期至本世纪初,受当时社会经济水平、边坡支护设计施工水平、施工条件等因素的限制,修建的石砌挡土墙墙体一般以干砌为主,砂浆较少,空腔多,整体性较差,在多种客观因素的共同作用下,常见开裂、鼓胀、砂浆脱落甚至滑移、坍塌等不稳定现象,需要进行加固。在对老旧石砌挡土墙的加固处理施工中,重点之一是保障施工期间的安全。通过实践,介绍了锚固法加固老旧石砌挡土墙施工过程中,通过优化施工顺序、施工机械和施工工艺等方面的措施有效控制施工过程中的安全,来保障施工安全,实践表明,以上措施是可行的。

关键词: 石砌, 挡土墙, 加固, 施工安全, 保障措施

Abstract: From the end of the last century to the beginning of this century, restricted by many factors, such as, the social and economic level, the design and construction level of excavation support, and construction conditions at that time, the stone masonry retaining walls constructed were generally mainly dry masonry with less mortar, many cavities, and poor integrity. Under the combined effect of various objective factors, unstable phenomena such as common cracking, bulging, mortar missing, and even sliding and collapse were often observed, and the wall rehabilitation is required. During the rehabilitation construction of old stone masonry retaining walls, one of the key aspects is to ensure safety during the construction. Through practice, it is introduced that in the construction process of reinforcing old stone masonry retaining walls by the anchoring method, measures such as optimizing the construction sequence, construction equipment, and construction technology were adopted to effectively control the safety during the construction process and ensure construction safety. Practice shows that the above measures are feasible.