复杂环境下地铁折返线矿山法施工处理措施

王文辉   

  1. (武汉铁四院工程咨询有限公司,武汉 430063)
  • 收稿日期:2024-10-24 修回日期:2024-11-06 出版日期:2025-04-30 发布日期:2025-06-03
  • 作者简介:王文辉(1977-),男,高级工程师,研究方向为城市轨道交通。

Measures for Mining Method Construction of Subway Turnback Line in Complex Environment

WANG Wenhui   

  1. (Wuhan China Railway Siyuan Engineering Consulting Co. Ltd., Wuhan 430063)
  • Received:2024-10-24 Revised:2024-11-06 Online:2025-04-30 Published:2025-06-03

摘要: 长沙地铁3号线为已开通运营的地铁线路,其中东塘站暗挖折返线段工程为双线大跨矿山法断面。隧道沿路中,周边建筑密集,无便利的场地设置竖井开辟工作面,隧顶临近高透水卵石地层,地质条件差。经过现场详细踏勘,竖井最终选择在的路中位置,避开行道树,围挡场地狭窄、面积小,施工困难,侧面紧临并行的同步掘进盾构隧道,属于城中心繁华地带高风险隧道工程。竖井半骑跨于矿山法隧道,期间仔细优化了隧道竖井开挖、回填方案,紧邻盾构隧道的并行掘进作业处理措施,并简述了竖井、暗挖漏水风险的抢险情况等,最终克服困难顺利完成了暗挖隧道的实施,为后续施工类似工程提供了较好的借鉴。

关键词: 地铁, 折返线, 隧道, 矿山法, 竖井

Abstract: The Changsha Metro Line No. 3 is a subway line that has in operation. The underground excavation and turnaround section of the Dongtang Station is a double track large-span length section constructed by mining method. Along the tunnel alignment, there are dense distributed buildings in the surrounding area, and there is no convenient site to set up vertical shafts to create working faces. The top of the tunnel is close to highly permeable pebble formations, and the geological conditions are poor. After a detailed on-site survey, the vertical shaft was finally chosen to be in the middle of the road, avoiding roadside trees. The enclosed area is narrow and small, making construction difficult. The side is adjacent to a parallel synchronous excavated and shielded tunnel, which belongs to a high-risk tunnel project in the bustling area of the city center. The vertical shaft half rode over the mining method excavated tunnel, carefully optimizing the excavation and backfilling plan of the tunnel vertical shaft, handling measures for the parallel excavation operations adjacent to the shielded tunnel and briefly describing the emergency of the water leakage risks in the vertical shaft and underground excavation. Finally, overcoming difficulties, the implementation of the underground excavation tunnel was successfully completed, providing a good reference for the similar construction projects in the future.

Key words: Subway, Turnback Line, Tunnel, Mining Method, Vertical Shaft