土工基础 ›› 2023, Vol. 37 ›› Issue (3): 524-527.

• 测试技术 • 上一篇    下一篇

地铁土压平衡盾构切穿桩基础模拟试验研究

杨溢军1,王寒冻1,杨 辉2,徐林虎1   

  1. (1.宁波市市域铁路投资发展有限公司,浙江宁波 315000;2.杭州市地铁集团有限责任公司,杭州 310020)
  • 收稿日期:2022-10-28 修回日期:2022-11-15 出版日期:2023-06-30 发布日期:2023-07-06
  • 作者简介:杨溢军(1990-),男,硕士,工程师,研究方向为轨道交通、岩土工程及地下工程。

Field Trial Tests of Subway Shielded Tunnel Cutting Through the Existing Piled Foundations

YANG Yijun1, WANG Handong1, YANG Hui2, XU Linhu1   

  1. (1.Ningbo Suburban Railway Investment Development Co. Ltd., Ningbo 315000;
    2.Hangzhou Metro Group Co. Ltd., Hangzhou 310020)
  • Received:2022-10-28 Revised:2022-11-15 Online:2023-06-30 Published:2023-07-06

摘要: 地铁盾构隧道通常不可避免地会遇到城市桥梁工程桩基,多采用将桥梁整体拆除重建或者线路小曲线绕避等方式,盾构直接切桩穿越的研究较少。以苏州某地铁工程为例,改进现有盾构机功能,开展盾构切桩模拟试验,试验对不同工况和切桩模式下切割桩基过程中的桩身变化、刀盘性能、盾构掘进参数指标及桩基的磨损切割过程进行了全程监控。试验证明了土压平衡盾构机切沉积土层中大直径混凝土桩的可行性,盾构机根据实际要求进行相关改进后可以满足高水位沉积土层中的切桩要求。试验结果可为盾构切桩专项监测方案、专项应急预案的制定提供依据,也可为类似工程设计及施工提供参考。

关键词: 地铁, 盾构, 桩基, 试验

Abstract: The subway shielded tunnel usually inevitably encounters the pile foundations in the urban environment. When the piled foundations are encountered, the conventional methods are to replace the above bridge or change the subway alignment. There is less reported on the direct cutting through the piles by the shielded tunneling. This paper presents a case history of subway project in Suzhou which the existing shielded machine functions are improved, and the simulation test of shielded pile cutting is performed. The test monitored the deflection of the affected piles, the performance of cutter head, the shield tunneling parameters and the abrasion and cutting process of piled foundation in the process of cutting piled foundation under different working conditions and pile cutting modes. The trial test proves that it is feasible for EPB shielded machine to cut large diameter concrete piles in sedimentary soils, the shielded machine can meet the requirements of pile cutting in the high-water level sedimentary soil layer after the relevant improvement according to actual requirements. The test results can provide basis for the formulation of special monitoring scheme and special emergency plan for shield pile cutting, and also provide guidance for the design and construction of similar projects.

Key words: Metro, Shield Tunneling, Piled Foundation, Tests

中图分类号: