土工基础 ›› 2023, Vol. 37 ›› Issue (3): 438-441.

• 专题论述 • 上一篇    下一篇

聂拉木县冲堆普流域冰湖变化及溃决危险性分析

李观波,张卢明   

  1. (核工业西南勘察设计研究院有限公司,成都 610061)
  • 收稿日期:2022-09-05 修回日期:2022-09-19 出版日期:2023-06-30 发布日期:2023-07-05
  • 作者简介:李观波(1985-),男,高级工程师,研究方向为水文地质、工程地质、环境地质。

Change of Ice Lake and Collapse Hazards Evaluation of Chongdui Gully Basin in Nyalam County

LI Guanbo, ZHANG Luming   

  1. (Nuclear Industry Southwest Survey & Design Institute Co. Ltd., Chengdu 610061)
  • Received:2022-09-05 Revised:2022-09-19 Online:2023-06-30 Published:2023-07-05

摘要: 聂拉木县冲堆普流域曾于2002年爆发过两次大规模泥石流灾害,主要原因是冰湖溃决引发,通过对2017年、2001年遥感影像并与1987年的数据对比,发现近30年来流域内的主要冰湖面积均发生了巨大的变化,初步分析得出部分冰湖存在可能溃决的危险。结果表明:近30年来,嘎龙错面积增加了225%,嘉龙错面积增加了101%;处于高度危险和较高危险状态的冰湖各有1个;通过嘎龙错终碛堤1/3和1/2溃决模式进行计算,得到溃决流量分别为3 954 m3·s-1、9 340 m3·s-1。当嘎龙错按1/3模式溃决时,洪水洪峰到达聂拉木县灾后重建普洛规划新区后,将有45 m宽的场区范围被淹没,一旦形成泥石流,峰值流量达6 899 m3·s-1,泥石流泥深达13 m,淹没场区深度增加2倍,淹没范围扩大30%,同时将对沟口中尼公路大桥造成严重破坏。建议沟口规划区采用相应的防治措施以减轻冰湖溃决泥石流的危害。

关键词: 冲堆普, 冰湖变化, 溃决, 危险性

Abstract: Two large-scale debris flow hazards broke out in the Chongduipu Basin of Nyalam County in 2002, which were mainly caused by the ice lake break. Through the comparison of the remote sensing images in 2017 and 2001 and data in 1987, it is observed that the area of main ice lakes in the basin has changed greatly in the past 30 years. It is preliminarily analyzed that some ice lakes might break. The results show that the area of Galongcuo has increased by 225% and that of Jialongcuo by 101% in the past 30 years; There is one ice lake in a highest-risk state and one in a high-risk state. According to the analysis of the 1/3 and 1/2 breakout modes of Galongcuo Zhongqi Dike, the breakout discharge is 3954 m3/s and 9340 m3/s, respectively. When the Galongcuo collapses according to the 1/3 mode, after the flood peak reaches the post disaster reconstruction Puluo planned new area of Nyalam County, a 45 m wide site area will be submerged. Once a debris flow is formed, the peak flow will reach 6899 m3·s-1, the mud depth of the debris flow will reach 13 m, the depth of the submerged site will be doubled, and the submerged area will be expanded by 30%. At the same time, it will cause serious damage to the Zhongni highway bridge at the gully mouth. It is suggested that corresponding prevention and control measures should be taken in the planning area of the gully mouth to reduce the harm of ice lake break debris flow.

Key words: Chongdui Gully, Change of Ice Lake, Break, Hazards

中图分类号: