土工基础 ›› 2020, Vol. 34 ›› Issue (4): 515-519.

• 专题论述 • 上一篇    下一篇

金坛盐穴储气库注气排卤管口附近沉渣颗粒运动规律研究

王  斌   

  1. (中石化川气东送天然气管道有限公司,武汉 430020)
  • 收稿日期:2020-05-10 修回日期:2020-05-22 出版日期:2020-08-20 发布日期:2020-08-15
  • 作者简介:王 斌(1970-),男,工程师,研究方向为盐穴储气库工程建设和运营管理。

Movements of Sediment Particles Near the Inlet of a Brine Discharge Pipe of a Salt Cavern for Gas Storage

WANG Bin   

  1. (Sichuan to Eastern China Natural Gas Transmission Pipeline Co., SINOPEC, Wuhan 430073)
  • Received:2020-05-10 Revised:2020-05-22 Online:2020-08-20 Published:2020-08-15

摘要: 注气排卤是盐穴储气库建库成腔的重要步骤,准确描述注气排卤过程中管口附近沉渣颗粒运动规律是确定排卤管柱下深的基础和前提。根据注气排卤特点,建立注气排卤过程中排卤管口附近卤水流场数值模拟计算模型,对不同工况下卤水流场变化规律进行了模拟计算。然后,建立排卤管口附近不溶物沉渣颗粒运移的计算模型,并以获得卤水流场作为边界条件,对排卤管口附近沉渣颗粒运动规律进行模拟,优化出排卤管口与沉渣面间的距离。计算结果表明:注气排卤过程中仅排卤管口附近的卤水流场变化较为剧烈,排卤管口正下方区域的不溶物沉渣颗粒最易受到卤水流场改变的影响,最容易被吸入排卤管。注气排卤过程中不溶物沉渣颗粒逐渐向排卤管口附近区域聚集。金坛盐穴储气库注气排卤过程中排卤管口与沉渣面间距取2.0 m较为适宜,并指导了现场实际施工,取得了较好的应用效果。

关键词: 盐穴储气库, 注气排卤, 沉渣颗粒, 流场, 数值模拟计算

Abstract: Debrining by gas injection is one of the most important processes for the construction of a salt cavern for the natural gas storage. Accurately describe the movement state of the insoluble particles around the inlet brine discharge pipe is the basis and prerequisite for determination of the depth brine discharge pipe. A numerical model is established to predict the brine flow distribution around the inlet of the brine discharge pipe. The brine flow fields distribution under different conditions are numerically investigated. The resultant brine flow field distribution is serviced as the boundary condition. The distance between the inlet of the brine discharge pipe and the insoluble sediment particles is optimized. The results show the flow field distribution of the zone only around the inlet of the brine discharge pipe varies significantly. The insoluble sediment particles locating directly underneath the inlet of the brine discharge pipe is more likely to be affected by the brine flow fields, and that of the other location is less affected. The insoluble sediment particles concentrate around the inlet of brine discharge pipe. The distance between the inlet of brine discharge pipe and the insoluble sediments for the debrining of Jintan salt cavern gas storage is then proposed as 2.0 m, which has been used for an actual debrining and is approved an appropriate application.

Key words: Gas Storage Salt Cavern, Debrining, Insoluble Sediment particle, flow distribution field, numerical simulation