土工基础 ›› 2020, Vol. 34 ›› Issue (2): 145-151.

• 工程实录 • 上一篇    下一篇

裙楼上下同步逆作与主楼顺作相结合的基坑工程设计与实践

邸国恩1,2   

  1. (1.华东建筑设计研究院有限公司上海地下空间与工程设计研究院,上海 200011;
    2.上海基坑工程环境安全控制工程技术研究中心,上海 200011)
  • 收稿日期:2020-04-07 修回日期:2020-04-16 出版日期:2020-05-20 发布日期:2020-05-20
  • 作者简介:邸国恩(1979-),男,高级工程师,研究方向为地下工程。
  • 基金资助:
    上海市科委科研计划(18DZ1205300)

The Design and Practice of Foundation Pit Engineering Combining the Top-down Method for the Annex Building and Ordinary Excavation Method for Main Building

DI Guoen1,2   

  1. (1.East China Architecture Design & Research Institute Co., Ltd., Shanghai Underground Space & Engineering Design Institute, Shanghai 200011;
    2.Shanghai Engineering Research Center of Safety Control for Facilities Adjacent to Deep Excavations,Shanghai 200011)
  • Received:2020-04-07 Revised:2020-04-16 Online:2020-05-20 Published:2020-05-20
  • Supported by:
    (Scientific research plan of Shanghai Science and Technology Commission)

摘要: 以南京德基广场二期项目为背景,介绍了裙楼上下同步逆作与主楼顺作相结合的深基坑支护设计与实践,总结了裙楼上下同步逆作与主楼顺作相结合的关键技术与对策。实施与监测结果表明,裙楼上下同步逆作与主楼顺作相结合大大加快了裙楼的施工进度,实现了既定建设目标,整个实施过程有效的保护了周边环境,节约了社会资源,取得了良好的社会效益,可为类似工程提供借鉴和参考。

关键词: 地下空间开发, 深基坑, 上下同步逆作, 一柱一桩, 剪力墙托换

Abstract: Based on the second phase project of Nanjing Deji square, this paper introduces the design and practice of deep foundation pit engineering combining the topdown method for the annex building and ordinary excavation method for main building, and summarizes the key technologies and countermeasures of the combination of the topdown method for the annex building and ordinary excavation method for main building. The results monitoring show that the combination of the topdown method and ordinary excavation method greatly accelerates the construction progress of the annex building, achieves the established construction goal, effectively protects the surrounding environment, saves social resources, and achieves good social benefits, which can provide reference for similar projects.

Key words: underground space development, deep foundation pit, the topdown method, one column with one pile, changement of shear wall structures