土工基础 ›› 2026, Vol. 40 ›› Issue (4): 603-607.

• 工程实录 • 上一篇    下一篇

某复合土钉墙基坑险情分析与处理

乔丽平1,2,李韵迪1,2,杨超3,黄文彬1,2,谢凌梅1,2   

  1. (1.深圳市地质局,广东深圳 518023;2.深圳市岩土综合勘察设计有限公司,广东深圳 518172;3.五邑大学土木建筑学院,广东江门 529020)
  • 收稿日期:2024-06-25 修回日期:2024-07-05 出版日期:2026-08-30 发布日期:2026-08-26
  • 作者简介:乔丽平(1979-),男,硕士,教授级高工,研究方向为岩土工程设计、咨询和研究。
  • 基金资助:
    广东省普通高校特色创新项目(自然科学类)(2020KTSCX152)

Analysis and Treatment of Danger in a Composite Soil Nail Wall Foundation Pit

QIAO Liping1,2, LI Yundi1,2, YANG Chao3, HUANG Wenbin1,2, XIE Lingmei1,2   

  1. (1.Shenzhen Geology Bureau, Shenzhen 518023;
    2.Shenzhen Comprehensive Geotechnical Engineering Investigation & Design Co. Ltd., Shenzhen 518172;
    3.School of Civil Engineering and Architecture, Wuyi University, Jiangmen 529020)
  • Received:2024-06-25 Revised:2024-07-05 Online:2026-08-30 Published:2026-08-26

摘要: 复合土钉墙支护型式在基坑工程中因其经济性的优势经常被采用,近几年复合土钉墙基坑发生险情的案例也较多,以深圳地区某复合土钉墙基坑工程为例,介绍了该基坑工程概况、水文地质条件、基坑支护型式、局部支护段险情情况,结合计算分析,重点讨论了险情原因、加固处理措施及加固后效果,并与第三方监测结果作了对比分析。研究结果表明:对于垂直开挖的复合土钉墙基坑,基坑坡体浸入水后坡体岩土体抗剪强度降低,土钉抗拔力明显减弱,极易发生基坑局部失稳险情,合理设置1~2道小拉力预应力锚索可有效控制基坑变形,大大降低基坑局部失稳风险。该工程经验及分析结论对类似工程具有参考意义。


关键词: 复合土钉墙, 基坑, 险情分析与处理, 变形控制, 监测分析

Abstract: The composite soil-nailing wall support system is widely adopted in deep excavation engineering due to its strong economic advantages. However, in recent years, an increasing number of distress and failure incidents have been reported for excavations supported by composite soil-nailing walls. This paper examines a project in Shenzhen, detailing the overall excavation conditions, hydrogeological setting, support configuration, and the localized distress observed in a specific section of the composite soil-nailing wall. Based on numerical analysis, the study focuses on identifying the causes of the distress, evaluating the implemented reinforcement measures, and assessing their effectiveness, supplemented by comparative analysis with third-party monitoring data. The results indicate that for vertically excavated composite soil-nailing pits, water infiltration significantly reduces the shear strength of the slope’s geomaterials and markedly weakens the pullout resistance of soil nails, making localized instability highly likely. Introducing one to two rows of low-tension prestressed anchors can effectively control deformation and substantially reduce the risk of local failure. The engineering experience and analytical conclusions presented herein provide valuable reference for similar projects.

Key words: Composite Soil-nailing Wall, Deep Excavations, Hazards Analysis and Treatment, Deformation Control, Monitoring and Analysis

中图分类号: