土工基础 ›› 2026, Vol. 40 ›› Issue (2): 202-206.

• 工程实录 • 上一篇    下一篇

过街顶管隧道施工对下方既有轨道交通隧道变形影响研究

申晓明1,张灵熙1,马振旺2   

  1. (1.苏州轨道交通科技创新研究院有限公司,江苏苏州 215004;2.华设设计集团股份有限公司,南京 210014)
  • 收稿日期:2024-11-26 修回日期:2024-12-03 出版日期:2026-04-30 发布日期:2026-04-22
  • 作者简介:申晓明(1989-),男,高级工程师,研究方向为城市轨道交通设计管理。

Influence of Cross Street Tunnel Jacking on the Deformation of Underlying Existing Rail Transit Tunnels

SHEN Xiaoming1, ZHANG Lingxi1, MA Zhenwang2   

  1. (1.Suzhou Rail Transit Technology Innovation Research Institute Co. Ltd., Suzhou 215004;
    2.China Design Group Co. Ltd., Nanjing 210014)
  • Received:2024-11-26 Revised:2024-12-03 Online:2026-04-30 Published:2026-04-22

摘要: 以昆山前进中路地下人行通道顶管上跨既有运营苏州轨道交通11号线绣衣站~昆山城市广场站盾构区间为依托,建立三维数值模型,模拟分析工作井基坑开挖和顶管隧道顶推施工过程中轨道交通隧道的受力变形,并与现场监测数据相互印证。研究结果表明:顶管隧道与工作井基坑施工最终对下方轨道交通隧道的产生竖向隆起变形,顶管隧道施工持续时间对下方轨道交通隧道的扰动影响程度大于顶管隧道工作井基坑的影响,轨道交通隧道5 m范围内的顶管隧道顶推施工对轨道交通隧道产生的隆起变形速率最大,现场监测数据与数值计算基本吻合,验证了数值计算的合理性。

关键词: 顶管隧道, 工作井, 轨道交通, 轨道交通隧道, 数值计算

Abstract: Based on the shielded excavation interval between Xiuyi station and Kunshan City Square Station of Suzhou rail transit line No. 11, a three-dimensional numerical model was established. The numerical model considers the relative position of the working shaft of the pedestrian crossing, the jacking tunnel and the shielded excavation tunnel. The stress and deformation of the shielded tunnel during the excavation of the working shaft foundation pit and the jacking construction of the tunnel jacking are simulated and analyzed, which were calibrated with the field monitoring data. The research results show that: the construction of tunnel jacking and working shaft foundation pit finally produces vertical heave deformation of the lower rail transit tunnel, the influence of tunnel jacking construction duration on the disturbance of the lower shield tunnel is greater than that of the working shaft foundation pit of the tunnel jacking, and the tunnel jacking within 5m of the shielded tunnel has the largest heave deformation rate on the shielded tunnel, and the field monitoring data is generally consistent with the numerical calculation, which verifies the rationality of the numerical calculation.

Key words: Tunnel Jacking, Working Shaft, Rail Transit, Shielded Tunnel, Numerical Simulation