土工基础 ›› 2026, Vol. 40 ›› Issue (2): 184-189.

• 工程实录 • 上一篇    下一篇

十堰张家沟填土边坡失稳变形成因与处置建议

朱文彩,陈江军,王芳,张庚丽   

  1.  (湖北省地质局水文地质工程地质大队,湖北荆州 434020)
  • 收稿日期:2024-03-04 修回日期:2024-03-08 出版日期:2026-04-30 发布日期:2026-04-22
  • 作者简介:朱文彩(1979-),男,高级工程师,研究方向为岩土工程勘察设计和水工环地质。
  • 基金资助:
    湖北省自然资源厅科技项目(HBZX-2023-020)

Causes of Instability and Deformation of Zhangjiagou High Fill Slope in Shiyan and Mitigation Recommendations

ZHU Wencai, CHEN Jiangjun, WANG Fang, ZHANG Gengli   

  • Received:2024-03-04 Revised:2024-03-08 Online:2026-04-30 Published:2026-04-22

摘要: 十堰张家沟填土边坡填筑厚度为10.0~15.0 m,在2023年秋汛期间发生失稳变形。根据填土边坡的地质条件、变形特征、影响因素等,总结其成因模式为:坡顶填土加载和顺向坡结构为变形失稳的产生提供了基础条件,支挡结构自身强度及其地基承载力不足导致失稳变形无法避免,强降雨造成的填土饱水增重和强度降低是变形失稳的促发因素,其发展过程经历了初始、蠕滑和破坏三个阶段。稳定性分析表明,填土边坡所处斜坡在填土加载前处于稳定状态,在填土加载后处于局部不稳定、整体基本稳定状态,填土边坡临空面支挡结构的整体性已经遭到破坏,在综合考虑费用、难度及时间等因素,建议清除边坡填土及其支挡结构以消除地质灾害隐患。

关键词: 人工填土, 填土边坡, 滑坡变形, 成因分析, 地质灾害

Abstract: A Zhangjiagou fill slope in Shiyan with a height between 10.0 and 15.0m is unstable and deformed due to the influence of Huaxi Autumn in 2023 and other factors. According to the geological conditions, deformation characteristics and influencing factors on this fill slope, a genetic failure mode is summarized as follows: the fill load on the top of the slope and the forward slope structure provide basic conditions for the occurrence of the deformation and instability; the instability and deformation caused by the insufficient strength of the retaining structure and the foundation bearing capacity cannot be avoided; and the saturated weight and strength reduction of the fill soils caused by heavy rainfall are also the contributing factors of excessive deformation and instability. The excessive deformation of the fill slope development process has experienced three stages: initial stage, creep stage and failure stage. The stability analysis shows that the fill slope is in a stable state before the fill operation started; This slope is in a partial unstable and marginally stable state after the fill loading. The integrity of the support structure at the free face of the fill slope has been damaged. Considering the cost, difficulty, time and other factors, it is recommended to remove the fill and its support structure of the slope to eliminate the hidden factors of geological hazards.

Key words: Artificial Fill, Fill Slope, Landslide Deformation, Cause Analysis, Geologic Hazards