土工基础 ›› 2025, Vol. 39 ›› Issue (6): 955-959.

• 专题论述 • 上一篇    下一篇

岩溶地区桩基技术研究

李福泉   

  1. (杭州西投置业有限公司,杭州 310030)
  • 收稿日期:2025-01-26 修回日期:2025-02-17 出版日期:2025-12-31 发布日期:2026-01-31
  • 作者简介:李福泉(1970-),男,高级工程师,研究方向为土木工程技术与管理。

Study on Pile Foundations in Karst Regions

LI Fuquan   

  1. (Hangzhou Quito Real Estate Co. Ltd., Hangzhou 310030)
  • Received:2025-01-26 Revised:2025-02-17 Online:2025-12-31 Published:2026-01-31

摘要: 越来越多的建筑物面临岩溶地质条件下桩基础设计与施工难题。以杭州某项目桩基工程实践为例,对岩溶发育区桩基础设计、施工技术进行了系统研究。针对项目具体情况,通过优化设计参数、对比分析桩基础设计方案,选择灌注桩穿越岩溶区段的方案,进行一桩一探查明桩基岩溶分布情况,经比较后选用旋挖桩机施工,经过桩基施工多方案的对比分析,以进度和成本最优的原则,选择桩体混凝土超灌方案实施,并针对桩基施工过程中的泥浆护壁、旋挖桩机的施工安全、混凝土灌注及钢筋笼被卡等具体问题采取了有针对性的技术措施,在保证工程质量和安全的基础上,加快了工程进度,并有效降低了工程造价,桩基检测结果均符合设计及规范要求,可为同类工程提供参考。

关键词: 岩溶地质, 桩基, 灌注桩, 设计优化, 施工技术

Abstract: More buildings are facing difficulties in pile foundation design and construction under karst geological conditions. The case history of a project in Hangzhou is presented in this paper. A systematic study was conducted on the design and construction methods of pile foundations in well-developed areas. Based on the specific situation of the project, the design parameters were optimized, and the pile foundation design scheme was compared and analyzed. The plan of using cast-in-place piles to pass through karst sections was selected, and the distribution of rock cavity was explored at each pile location. After comparison, the rotary pile driver was selected for the construction. After comparing and analyzing multiple pile foundation construction schemes, the principle of schedule and cost optimization was adopted to implement the pile concrete over pouring scheme. Targeted technical measures were taken to address specific issues such slurry borehole protection, construction safety of rotary pile drivers, concrete pouring, and steel reinforcement cage jamming during the pile foundation construction process. On the basis of ensuring project quality and safety, project schedule was accelerated, and the project cost was effectively reduced. The pile foundation QA testing results all met the design and specification requirements, which can provide guidance for similar projects.

Key words: Karst Geology, Pile Foundation, Cast-in-Place Piles, Design Optimization, Construction Methods

中图分类号: