土工基础 ›› 2022, Vol. 36 ›› Issue (6): 812-815.

• 工程实录 • 上一篇    下一篇

双排桩在某红黏土及填方基坑中的应用

彭镜豫1,孟宝华2   

  1. (1.西南石油大学,成都 620360;2.绵阳市第三人民医院·四川省精神卫生中心,四川绵阳 621000)
  • 收稿日期:2021-05-20 修回日期:2021-05-28 出版日期:2022-12-31 发布日期:2022-12-27
  • 作者简介:彭镜豫(2000-),男,本科在读,研究方向为房屋建筑设计及新技术开发、应用。

Application of Double Row Piles in a Deep Excavation Support in Red Clay and Backfills

PENG Jingyu1, MENG Baohua2   

  1. (1.Southwest Petroleum University, Chengdu 620360;
    2.The Third Hospital of Mianyang, Sichuan Mental Health Center , Mianyang, Si Chuan 621000)
  • Received:2021-05-20 Revised:2021-05-28 Online:2022-12-31 Published:2022-12-27

摘要: 贵州某红黏土基坑,桩后为新近回填土及红黏土,基坑深约11.7 m,采用双排桩支护,理论计算变形不满足规范要求。经专家论证,勘察、设计单位复核,综合填料成分、填料压实程度及回填年限,分区域考虑回填土参数,同时考虑桩间增加锚索作为应急方案,动态设计,加强变形监测,信息法施工,最终通过实测数据及实施效果,显示基坑阳角变形在规范允许范围内,验证了该支护结构及方案的可靠性。总结了双排桩设计注意事项,可为类似项目的设计提供一定的参考。

关键词: 深基坑, 红黏土, 变形监测, 填土, 双排桩

Abstract: A deep excavation project was located in Guizhou red clay area. The new backfill and red clay deposits are at the backside of supporting soldiers. The depth of deep excavation is about 11.7 m and the double row pile support method were used. The existing theoretical analyses of the deformation do not meet the requirements of the project specifications. As a results, a panel of expert discussion was conducted, the review of the existing design parameters by the structural and geotechnical firms, review of the composition of the backfill material, degree of compaction and age of the backfill material have been performed. A new observational method was used in deep excavation construction. The construction monitoring program was implemented, and the monitored data was used the future construction excavation. Further, the ground anchor to be installed in between the double row piles was used as the emergency remediation approach if the excessive deformation was observed in the supporting structures. The construction monitoring data indicated that the deformation of the deep excavation supporting structure met the design required. The reliability of the new method has been verified and the results can be applied in the excavation support in similar projects.


Key words: Deep Excavation, Red Clay, Deformation Monitoring, Backfills, Double Row Piles

中图分类号: