土工基础 ›› 2022, Vol. 36 ›› Issue (3): 308-312.

• 工程实录 • 上一篇    下一篇

型钢混凝土柱在单层盖挖地铁中的应用

蔡磊川1,田清彪1,唐志同2,张冬冬3   

  1. (1.广州地铁设计研究院股份有限公司,广州 510010;2.济宁四和供热有限公司,山东济宁 272000;
    3.济南轨道交通集团有限公司,济南 250014)
  • 收稿日期:2021-02-05 修回日期:2021-02-19 出版日期:2022-06-30 发布日期:2022-06-24
  • 作者简介:蔡磊川(1990-),男,工程师,硕士,研究方向为地铁结构设计。

Application of Rolled Steel Reinforced Concrete Column in the Cut and Cover Construction of a Metro Station

CAI Leichuan1, TIAN Qingbiao1, TANG Zhitong2, ZHANG Dongdong3   

  1. (1.Guangzhou Metro Design and Research Institute Co. Ltd., Guangzhou 510010;
    2.Jining Sihe Heat Supply Co. Ltd., Jining 272000;
    3. Ji Nan Rail Transit Group Co.LTD,Jinan 250014)
  • Received:2021-02-05 Revised:2021-02-19 Online:2022-06-30 Published:2022-06-24

摘要: 钢管混凝土柱因具有较高的承载力常在盖挖法地铁车站作为永临结合柱使用,但其存在梁柱节点连接复杂、施工难度大等缺点。以天津地铁6号线某车站盖挖法施工的单层附属结构为实例,提出了一种由角钢格构柱外包混凝土组成的型钢混凝土组合柱型式。格构柱的角钢和缀板外侧焊接一定数量的锚栓用以提高抗剪能力,并在格构柱四周布置一定数量的纵筋。梁柱节点处的梁纵向钢筋从格构柱角钢间隙穿过,被角钢切断的钢筋焊接在角钢和缀板上,同时设置补强纵筋。格构柱在施工阶段作为临时柱用于支持顶板,待基坑开挖至底部后浇筑组合柱混凝土,形成永久柱。此种型式简化了梁柱节点的连接方式,优化了围护结构与盖挖顶板的节点连接。现场实践证明,该方案便于施工、质量可靠。

关键词: 盖挖法, 型钢混凝土, 梁柱节点, 地铁结构

Abstract: Metro station using cut and cover construction method often uses rolled steel reinforced concrete as the permanent and/or temporary supporting columns, but there are disadvantages such as complicated connection joints and difficult for the installation. In this paper, a single-story auxiliary structure constructed by the cut and cover excavation in a station of Tianjin Metro Line 6 is presented with a new type of rolled steel reinforced concrete composite column. The new structure is composed of concrete encased angle steel column. Some studs are welded on the outside of the angle and plate steel and the plate columns to improve the shear resistance, and some reinforced bars are placed in the concrete column. The longitudinal steel reinforcement bars of the beam at the beam-column joint pass through the angle steel gap of the concrete column, and the steel bars cut by the Angle steel are welded on the Angle steel and the fix plate, and the reinforcing longitudinal bars are provided. Rolled steel columns are also used as temporary columns to support the roof in the construction stage. After the foundation is excavated to the bottom, the composite column concrete is poured to form permanent columns. The connection method of the column joints optimizes the connection between the envelope structure and the connection joints. The field practice has proved that this method is convenient for the construction and reliable in quality control.

Key words: cut and cover excavation, rolled steel reinforced concrete, beamcolumn joints, subway structure