土工基础 ›› 2021, Vol. 35 ›› Issue (6): 690-693.

• 工程实录 • 上一篇    下一篇

富水全风化花岗岩隧道初支下沉变形机理与防治技术研究

黄银海   

  1. (福建省高速路桥工程有限公司,福建厦门 361008)
  • 收稿日期:2021-08-02 修回日期:2021-08-06 出版日期:2021-12-30 发布日期:2021-12-24
  • 作者简介:黄银海(1983-),男,高级工程师,研究方向为公路边坡、桥梁设计、施工和建设管理。

Analysis and Mitigation of Settlement of Initial Support of Tunnel Excavation in Saturated Completely Weathered Granite

HUANG Yinhai   

  1. (Fujian Highway Bridge Engineering Co. Ltd., Xiamen 361008)
  • Received:2021-08-02 Revised:2021-08-06 Online:2021-12-30 Published:2021-12-24

摘要: 以某隧道富水全风化花岗岩段初支下沉变形防治实践为例,研究揭示了隧道初支下沉变形机理,提出了富水全风化花岗岩隧道初支下沉变形总体防治原则,并通过理论分析建立了以洞内外降排水、地表预注浆、初支支护强度加强及监控量测为主的综合防治技术体系,同时在现场成功应用实施,成功解决了该隧道富水全风化花岗岩段初支下沉变形防治技术难题。研究成果对类似条件下隧道建设具有借鉴意义。

关键词: 富水, 全风化花岗岩, 初支下沉, 防治技术

Abstract: This paper presents a case history of mitigating the settlement of initial support of tunnel excavations in the saturated completely weathered granite soils and the factors that inducing the settlement are also investigated. The general guidelines for minimizing the settlement in the initial support are also proposed. Settlement mitigation measures, such as, dewatering around the excavated area, grouting from the ground surface and increasing the stiffness of the initial supporting structures and the construction monitoring system were established based on the theoretical analysis. The comprehensive approaches were applied in the construction and resolved the excessive deformation in the initial support of tunnel excavation in saturated completely weathered granite soils.


Key words: saturated, completely weathered granite, settlement of initial support, mitigation method

中图分类号: