›› 2015, Vol. 29 ›› Issue (4): 127-129.

• 工程实录 • 上一篇    下一篇

刘庄矿井主井井塔人工冻融土地基岩土工程勘察与评价

程韶清   

  1. (煤炭工业合肥设计研究院,合肥 230041)
  • 收稿日期:2015-06-15 出版日期:2015-08-20 发布日期:2015-11-06
  • 作者简介:程韶清(1964-),男,本科,高级工程师,总工程师,研究方向为岩土工程勘察、工程测量,基坑设计及桩基检测。

Geotechnical Investigations for the Liuzhuang Mine Main Shaft Excavation with Ground Freezing

CHENG Shaoqing   

  1. (Hefei Design Research Institute for Coal Industry, Hefei 230041)
  • Received:2015-06-15 Online:2015-08-20 Published:2015-11-06

摘要: 通过对刘庄矿井主井井塔冻融土地基在冻结前和解冻后进行岩土工程勘察,对采用不同勘察手段所取得的结果进行对比分析,找出冻融土地基土层物理力学性质变化规律,为设计人员提供可靠的设计参数。

关键词: 主井井塔, 冻融土, 冻结, 解冻

Abstract: The geotechnical investigations were conducted on the Liuzhuang Mine main shaft tower ground freezing excavation site before and after the ground freezing when the ground was completely thawed. Different test methods were applied at the site and changes of the soil properties before and after the ground freezing were compared.  

Key words: Main Mine Shaft Tower, Soil Freeze and Thaw, Ground Freezing, Thaw