堆积体成因分析及综合治理施工措施

王海建   

  1. (中国水利水电建设工程咨询西北公司,西安 710075)
  • 收稿日期:2013-07-08 出版日期:2013-10-22 发布日期:2013-10-28
  • 作者简介:王海建(1983-),男, 中级职称, 研究方向为水工结构。

Evaluation of and Mitigation of a Slipped Soil Deposit

WANG Haijian   

  1. (China Northwest Water Conservancy & Hydropower Engineering Consulting Company,Xi'an,710075)
  • Received:2013-07-08 Online:2013-10-22 Published:2013-10-28

摘要: 梨园水电站在工程施工过程中出现堆积体滑移,通过对堆积体滑移的研究分析,采取了多种措施对其进行控制,监测数据表明,堆积体滑移稳定控制效果较好。其施工控制措施,对其他类似工程的分析和防治,具有积极的借鉴意义。

关键词: 堆积体, 滑移, 控制, 监测, 稳定

Abstract: A soil deposit slipped during the construction of Liyuan Hydropower Station. The causes of the sliding was analyzed. Various measures were taken to control further development of the sliding. Monitoring data suggest that measures selected were effective in stabilizing the deposit.

Key words: Hydropower Station, Soil Deposit, Sliding, Monitoring, Stabilization