浅埋大跨黄土隧道施工过程数值模拟及位移监测
孙星亮1,陈智慧2
Numerical Analysis of the Construction Sequence of the Shallow Buried Large Cross Section Tunnel and the Field Monitoring of Ground Movement
SUN Xingliang1, CHEN Zhihui2
土工基础 . 2017, (3): 282 -286 .