›› 2015, Vol. 29 ›› Issue (3): 81-83.

• 工程实录 • 上一篇    下一篇

浅埋地铁隧道施工过程风险应对案例分析

丁召辉   

  1. (中铁十四集团隧道工程公司,北京 100000)
  • 收稿日期:2015-02-01 出版日期:2015-06-20 发布日期:2015-06-26
  • 作者简介:丁召辉(1983-),男,工程师,主要研究工作为隧道及地下工程的施工稳定性研究。

Risks and Response Analyses in the Construction of a Shallow Buried Subway Tunnel

DING Zhaohui   

  1. (China Railway Shisiju Group Corporation Tunnel Engineering Co. Ltd., Beijing 100000)
  • Received:2015-02-01 Online:2015-06-20 Published:2015-06-26

摘要: 以北京地铁6号线南锣鼓地铁隧道施工近接穿越正上方地表老旧民房为例,分析施工过程存在的风险,提出采用大管棚、深孔注浆等多种技术相结合的施工方法,实践证明:采用该方法对近接段隧道进行支护,实现了隧道的顺利施工,同时确保地面建筑物的安全。

关键词: 地铁隧道, 施工, 风险

Abstract: This paper presents a case history of the Nanluogu Subway Tunnel construction in Beijing Metro No. 6 project. An old residential buildings are located right above the proposed the tunnel. The potential risks during the tunnel excavation are identified and the measures that mitigating those hazards are presented. The combination of the large diameter steel pipe shielding and the deep hole grouting methods are proved to be successful. The use of the shield support is critical to the safe excavation of the tunnel when is close to the residential buildings. It is also an effective protective measure for the deformation control of the buildings on the ground.

Key words: Subway Tunnel, Tunnel Construction, Risk Management