某地铁隧道工后沉降稳定性判断研究

陈星   

  1. (中铁四院集团西南勘察设计有限公司,昆明〓650200 )
  • 收稿日期:2013-10-24 出版日期:2014-06-20 发布日期:2014-08-20
  • 作者简介:陈星(1987-),助理工程师,研究方向为隧道设计及科研。

Analysis the Post Construction Settlement of a Metro Tunnel

CHEN Xing   

  1. (China Railway Siyuan Group Southwest Survey and Design Co., Ltd, Kunming, 650200)
  • Received:2013-10-24 Online:2014-06-20 Published:2014-08-20

摘要: 地铁隧道建设规模不断扩大,工程建设期间经常需要判定工后沉降是否稳定,其关系到后期设备安装等工期计划。工程实践中常采用理论公式法、经验推算预测法及数值分析等方法。根据某地铁明挖隧道实例,采用上述三种方法判断研究工后沉降稳定问题,为合理安排工程筹划提供参考。

关键词: 地铁隧道, 工后沉降, 理论公式法, 经验推算预测法, 数值分析法

Abstract: In the metro construction practice, it is often required to predict the post construction settlement magnitude during the construction. A stable post construction settlement is critical for the scheduling of the equipment installation and others. Three methods are often used: theoretical method; empirical method; and numerical analysis method. This paper presents the results of all three methods. A decision of whether a stable post construction settlement can be obtained was made based on three settlement prediction results.

Key words: Metro Tunnel, Post Construction Settlement, Theoretical Method, Empirical Method, Numerical Analysis