汕头市看守所业务用房不同设计阶段因建筑物位置改变修改地基基础设计的分析

蔡隆俊   

  1. (汕头市通程泛华设计咨询有限公司,广东汕头 515054)
  • 收稿日期:2024-07-16 修回日期:2024-07-26 出版日期:2026-08-30 发布日期:2026-08-26
  • 作者简介:蔡隆俊(1973-),男,高级工程师,研究方向为高层建筑结构、结构抗震设计、地基基础工程。

Analysis of Modification of Foundation Design for a Service Facility of Shantou Detention Center in Different Design Stages due to Change of Building Location

CAI Longjun   

  1. (Shantou Tongcheng Fanhua Design & Consulting Co. Ltd., Shantou 515054)
  • Received:2024-07-16 Revised:2024-07-26 Online:2026-08-30 Published:2026-08-26

摘要: 介绍汕头市看守所业务用房不同设计阶段基础设计与造价对比,初步设计阶段考虑局部区域采用水泥搅拌桩地基处理后的复合地基,选用浅基础设计方案;施工图设计阶段因实际建筑物位置变化,相应修改成冲孔灌注桩基础,指出因建筑物位置改变引起地质条件变化,相应基础形式需要通过分析,及时调整修改。因涉及政府部门管理、建设单位使用要求改变、实际施工条件等诸多因素影响,工程技术条件往往会有改变,工程管理上应该按项目实际情况进行控制管理,可供类似工程参考。


关键词: 地基处理, 水泥搅拌桩, 复合地基, 浅基础, 冲孔灌注桩基础, 后注浆

Abstract: This paper presents a comparative analysis of foundation design schemes and corresponding cost implications across different design stages for the Shantou Detention Center service-facility project. In the preliminary design stage, a composite foundation scheme was adopted, in which cement-mixed columns were used for localized ground improvement, followed by a shallow-foundation system. During the construction-drawing stage, however, adjustments to the building layout resulted in changes to the underlying geological conditions, necessitating a redesign to a percussive bored cast-in-place pile foundation. The study highlights that shifts in building location can alter subsurface conditions, requiring timely analytical reassessment and modification of the foundation system. Given the influence of multiple factors—including government management requirements, evolving user needs, and actual construction constraints—engineering technical conditions often change over the course of a project. Project management should therefore be based on real-time engineering conditions rather than rigidly adhering to the principle that later-stage design costs must not exceed earlier-stage budget limits. The findings provide a useful reference for similar engineering projects.

Key words: Ground Improvement, Cement Mixed Soil Column, Composite Foundation, Shallow Foundation, Percussive Bored Cast-In-Place Piles, Post-Grouted Pile Foundations