土工基础 ›› 2022, Vol. 36 ›› Issue (6): 937-940.

• 专题论述 • 上一篇    下一篇

地下室上浮造成的桩基失效模式有限元分析

陈林平1,2,邱志华1,2,陈秀辉1,2,张雄水1,2,曾 文1,2   

  1. (1.福建省建筑科学研究院有限责任公司,福州 350108 ;2.福建省绿色建筑技术重点实验室,福州 350108)
  • 收稿日期:2022-06-21 修回日期:2022-06-28 出版日期:2022-12-31 发布日期:2022-12-28
  • 作者简介:陈林平(1995-),男,硕士,助理工程师,研究方向为岩土工程。
  • 基金资助:
    福建省科技厅引导性项目:项目编号(2015H0004)

Finite Element Analysis of Pile Foundation Failure Modes Caused by Uplifting of Basement#br#

CHEN Linping1,2, QIU Zhihua1,2, CHEN Xiuhui1,2, ZHANG Xiongshui1,2, ZENG Wen1,2   

  1. (1.Fujian Academy of Building Research Co. Ltd., Fuzhou 350108;
    2.Fujian Provincial Key Laboratory of Green Buildings, Fuzhou 350108)
  • Received:2022-06-21 Revised:2022-06-28 Online:2022-12-31 Published:2022-12-28

摘要: 某工程地下室顶板以上覆土重量不足、连续降雨且排水井封填无法及时排水导致地下室发生上浮。现场调查发现,上浮使地下室侧墙、顶板等结构产生裂缝,通过设置排水井、地下室底板开孔泄压后,大幅缓解了地下室上浮,但已造成的损伤是不可逆的,尤其是桩基工程是否被破坏无从得知。为探究地下室上浮是否使桩基失效、以何种模式失效,采用ABUQUS对地下室上浮进行有限元模拟。分析得出,地下室上浮后,管桩与填芯之间的粘结作用被破坏,管桩与填芯脱离,随后,管桩在重力作用下略有下沉,填芯随承台与底板在浮力作用下位移继续增大。因此,地下室上浮问题应引起重视,切忌忽视地下室上浮对隐蔽工程造成的破坏。

关键词: 地下室上浮, 桩基失效模式, 有限元法, 现场调查

Abstract: Insufficient weight of the overburden soil above the basement roof, continuous rainfall and the blockage of the drainage well usually lead to the uplifting movement of the basement. The field investigation indicated that the uplifting caused cracks at the sidewall, roof and other locations of the basement. By installing drainage wells and basement floor pressure release holes, the basement uplift movement was greatly alleviated. However, the damage caused is irreversible, especially the integrity of the pile foundation is unknown. To explore the basement uplift movement induced pile foundation integrity and failure modes, the commercial finite element analysis software ABUQUS is used to conduct the numerical simulation of the basement movement. The results show that, after the basement movement, the bonding between the pipe pile and the backfill core is damaged. Subsequently, the pipe pile settles slightly under the gravity, and the displacement of the core increases with the pile cap and the bottom plate under the buoyancy. Therefore, the problem of basement uplift movement should be paid attention to, and the damage caused by the basement uplift movement to underground projects should not be ignored.

Key words: Uplifting of Basement, Failure Modes of Pile Foundation, Finite Element Analysis, Field Survey

中图分类号: