土工基础 ›› 2022, Vol. 36 ›› Issue (5): 713-717.

• 工程实录 • 上一篇    下一篇

深圳市某老滑坡稳定性分析及防治措施研究

徐 星,耿雪峰,赵昌龙   

  1. (深圳市勘察测绘院(集团)有限公司,广东深圳 518028)
  • 收稿日期:2022-02-21 修回日期:2022-02-25 出版日期:2022-10-30 发布日期:2022-10-24
  • 作者简介:徐星(1988-),男,中级工程师,硕士,研究方向为地质灾害防治及岩土工程等。
  • 基金资助:
    深圳市科技创新委员会深圳市科技计划技术攻关项目(No.JSGG20160331154546471)

Stability Analysis and Prevention Measures of an Old Landslide in Shenzhen

XU Xing, GENG Xuefeng, ZHAO Changlong   

  1. (Shenzhen Geotechnical Investigation & Surveying Institution (Group) Co. Ltd., Shenzhen 518028)
  • Received:2022-02-21 Revised:2022-02-25 Online:2022-10-30 Published:2022-10-24

摘要: 为保证复活老滑坡的稳定性,研究其防治措施对地区地质灾害防治具有重要意义。以深圳市某既有老滑坡为例,通过地形测量、工程地质测绘和调查、钻探、原位测试等工作,对场地工程地质条件和滑坡特征进行综合分析,采用不平衡推力传递系数法对滑坡进行稳定性计算分析并给出滑坡防治方案。研究结果表明,该滑坡为老滑坡复活,两段滑坡,西侧段滑坡平面上形态呈簸箕状,东段滑坡平面上呈圆椅形;2018年8月底连续6 d大暴雨是导致滑坡复活的直接因素;提出在滑坡前缘抗滑段设置抗滑桩进行加固,部分坡段滑坡体进行卸载后采用锚杆(索)格构梁等防治措施。

关键词: 老滑坡, 形成机制, 稳定性分析, 防治措施

Abstract: To ensure the stability of old landslides after the activation, it is important to study the landslide triggering prevention and control measures for the regional geological hazard prevention and safety control. This paper presents a case history of the evaluation of an existing old landslide in Shenzhen. Different evaluation methods, such as, topographic survey, geotechnical test boring, engineering geological mapping and investigation, drilling, and other in-situ testing, were performed to comprehensively analyze the natural geographic and geological environmental conditions and landslide characteristics. The landslide stability was analyzed using the unbalanced thrust transfer coefficient method from the landslide prevention and control plan point of view. The results show that the landslide was triggered by the activation of an old landslide. Two sections of the landslide, the western section of the landslide was in the shape of a skip on the plane, and the eastern section of the landslide was in the shape of a round chair on the plane view. The heavy rainfall duration of six consecutive days at the end of the August was the direct factor that leading to the activation of the landslide. It is proposed that the anti-slip piles can be used in the anti-slip section of the front edge of the landslide for mitigation, and the upper part of the landslide body in some sections of the slope was set with anchor lattice beam reinforcement and other reinforcement measures, which provide reference for the investigation.


Key words: Old Landslide, Formation Mechanism, Stability Analysis, Prevention Measures