摘要: 泰宁隧道属特长、大断面、深埋、高地应力隧道,施工过程中面临诸多技术挑战。通过采取“择机封堵、超前帷幕注浆、径向灌浆、模袋和索囊封堵灌浆” 等技术,有效封堵了高压大流量地下水;通过采用长短距离相结合的综合地质超前预报方法,提高了不良地质体和地下水的预报精度;通过采取“超前应力解除、控制爆破、水胀式锚杆、挂网、钢筋拱肋、喷超细沸石粉添加剂混凝土为主”的岩爆预防体系,有效防治了岩爆灾害; 通过采用斜井送排式纵向分段通风,解决了隧道施工、运营通风技术难题。可为类似工程提供参考和借鉴。
关键词: 深埋长大隧道, 施工, 高压涌水, 通风, 关键技术
Abstract: The Taining tunnel is characterized as a super long and has a large crosssection. It is deeply buried with a high ground stress. The construction of this tunnel is a challenge. To seal off large volume of groundwater, a number of techniques are used: real time sealing; preventive curtain grouting; radial grouting; and grouting with gunny bags and strings bags. The adverse geological and groundwater conditions are detected by a comprehensive prediction method in combination of both long and short distances. The rock burst hazards was minimized by following methods: preventive geostress relief; controlled blasting; expansion anchoring; shotcrete with wire mesh; steel rebar reinforced rib; and shotcrete with super finegrained zeolite concrete additives. The ventilation concerns in the long large sized and deeply buried tunnel during the construction and the operation are addressed by the inclined shaft with sectional vertical ventilation technique. The research methodologies, approaches and conclusions of this case study can be used for other tunnel construction under similar conditions.
Key words: Long large sized and deeply buried tunnels, Tunnel construction, Pressurized groundwater intrusion, Ventilation, Critical construction technologies
吴存兴. 深埋长大泰宁隧道快速施工关键技术研究[J]. , 2012, 26(3): 57-60.
WU Cunxing. Accelerated Construction Technologies in Long Large Sized and Deeply Buried Taining Tunnel[J]. , 2012, 26(3): 57-60.