土工基础 ›› 2021, Vol. 35 ›› Issue (5): 578-582.

• 专题论述 • 上一篇    下一篇

粉质黏土地层隧道沉降变形控制技术研究

张 超,王 飞,吴 华,姜同虎   

  1. (安徽省交通规划设计研究总院股份有限公司公路交通节能环保技术交通运输行业研发中心,合肥 230088)
  • 收稿日期:2020-06-11 修回日期:2020-07-03 出版日期:2021-10-31 发布日期:2021-10-22
  • 作者简介:张 超(1989-),男,硕士研究生,研究方向为隧道及地下工程设计与研究。

Settlement and Deformation Control Measures for Tunnel in Silty Clay Soils

ZHANG Chao, WANG Fei, WU Hua, JIANG Tonghu   

  1. (Anhui Transport Consulting & Design Institute Co., Ltd.,Road Traffic Energy Saving and 
    Environmental Protection Technology Transportation Industry R & D Center, Hefei 230088)
  • Received:2020-06-11 Revised:2020-07-03 Online:2021-10-31 Published:2021-10-22

摘要: 针对公路隧道施工穿越粉质黏土地层时出现的沉降变形问题,分析了引起隧道沉降变形的原因,总结出了粉质黏土地层隧道沉降变形控制方法。以池州市汪家山隧道施工为背景,基于地表沉降、拱顶下沉、下台阶位移及周边位移等监测数据分析,总结了粉质黏土地层隧道结构受力和变形规律,对比分析了左、右线隧道采取的两种不同处治方案沉降变形控制效果。结果表明:粉质黏土地层隧道开挖时地表沉降与洞内沉降变形呈同步变化关系,同时采用基础注浆加固方案不仅有效地减小地表沉降和洞内变形,还可以缩短沉降变形稳定时间,且对隧道沉降变形控制效果比换填方案好。可为今后粉质黏土地层隧道的设计和施工提供参考。

关键词: 粉质黏土地层, 公路隧道, 监控量测, 沉降变形

Abstract: Excessive settlement deformation problem in highway tunnel construction is frequently encountered when it passes through the silty clay soils. This paper evaluates potential factors that might induce the excessive deformations in the highway tunnel excavation in the silty clay soils. Deformation control measures are also summarized. The results of construction of Wangjiashan Tunnel in Chizhou are presented as a background. The monitoring data of ground subsidence, settlement at the crest as well as the side of the tunnel are compared and analyzed so that the stress and strain characteristics of the tunnel could be obtained. Based on the analytical information, different tunnel excavation induced settlement control measures could be implemented in both left and right tunnel excavations. The results show that there was a synchronous change relationship between the surface settlement and the settlement deformation during the tunnel excavation in silty clay soils; the foundation grouting reinforcement program could, not only rapidly and effectively reduce the surface settlement and the deformation in the tunnel, but also shorten the stability time of the settlement deformation. The control effect of the settlement deformation in the tunnel excavation is better than that of the filling replacement measure. 

Key words: silty clay soils, highway tunnel, monitoring and measurement, deformation