土工基础 ›› 2021, Vol. 35 ›› Issue (5): 557-562.

• 工程实录 • 上一篇    下一篇

地铁盾构隧道近距离下穿公路箱涵结构影响研究

钟 晟   

  1. (长沙市轨道交通集团有限公司,长沙 410075)
  • 收稿日期:2020-07-03 修回日期:2020-07-19 出版日期:2021-10-31 发布日期:2021-10-21
  • 作者简介:钟 晟(1985-),男,工程师,硕士,研究方向为市政与轨道交通工程建设管理。

Influence of the Subway Shielded Tunnel Passing Through the Adjacent Highway Box Culvert

ZHONG Sheng   

  1. (Changsha Metro Transportation Group Co. Ltd., Changsha 410019)
  • Received:2020-07-03 Revised:2020-07-19 Online:2021-10-31 Published:2021-10-21

摘要: 以长沙地铁1号线盾构近距离下穿公路箱涵为研究背景,采用有限差分软件FLAC3D对盾构掘进施工穿越公路箱涵的全过程进行数值模拟,结合现场监测数据及数值计算结果,分析了盾构掘进对既有箱涵结构的扰动影响、横断面沉降、纵断面动态沉降变化规律。结果表明:左线掘进时,D1断面整体沉降呈“V”字型分布,掘进影响范围在3DD为隧道直径)内;右线掘进时,沉降曲线的沉降槽逐渐变宽,在两隧道中间出现沉降叠加的影响区,最终累计沉降达到-18.24 mm。左线靠近中心线的监测点在盾构通过是扰动最大,沉降变化速率为0.94 mm·m-1,盾尾通过时减少至0.40 mm·m-1,较好地反映了土体沉降变形规律;左右线中间区监测点D1-5受盾尾注浆扩散效果影响,土体沉降扰动变化规律不明显。箱涵沉降变形均未超过控制值,但受扰动地层固结、浆液凝固、孔隙水压力消散等影响,相对沉降量较大,建议在工程中同步注浆采用水泥-水玻璃双液浆环箍式注浆加固方式,以减小土体沉降变形。

关键词: 盾构掘进, 公路箱涵, 袖阀管加固, 沉降叠加, 沉降速率

Abstract: This paper presents the finite difference analysis results using FLAC3D of the effect of Tunnel Boring Machine (TMB) excavation of the Changsha Metro No. 1 tunnel on the adjacent highway box culvert. By comparing the field monitoring data and the numerical analysis results, effect of the tunnel excavation on the active highway box culvert such as settlement in the longitudinal and transverse direction were investigated. The results indicate that, in the left side of the tunnel excavation, the “V” shape of the settlement at D1 cross section was observed and settlement influence zone is within three times of the tunnel diameters; During the excavation of the right tunnel, the settlement trough was becoming wider and a zone of settlement superposition at area between two tunnels was formed and the maximum settlement was 18.24 mm. The monitoring point near the center line of the left line had the largest disturbance when the shielded tunnel passed through. The rate of the settlement change decreased from 0.94 mm·m-1 to 0.40 mm·m-1 as the distance to the excavation face increased, which reflected in the soil settlement and deformation monitoring values. The monitoring points D1-5 in the middle area of the left and right lines were affected by the grouting diffusion effect of shielded tail, and the variation of soil settlement disturbance was not obvious. The settlement deformation of the highway box culvert did not exceed the control value, but the differential settlement was relatively large due to the influence of the consolidation of disturbed strata, slurry solidification and pore water pressure dissipation. It was suggested that the circular grouting of cement-water glass slurry method should be adopted in the future projects to reduce the settlement deformation.

Key words: shielded tunnel, highway box culvert, sleeve pipe reinforcement, settlement superposition, settlement rate