土工基础 ›› 2021, Vol. 35 ›› Issue (4): 463-467.

• 专题论述 • 上一篇    下一篇

长线型地下综合管廊基坑降水数值分析

曾凡福   

  1. (中铁一局集团厦门建设工程有限公司,福建厦门 361000)
  • 收稿日期:2020-04-27 修回日期:2020-05-12 出版日期:2021-08-31 发布日期:2021-08-19
  • 作者简介:曾凡福(1982-),男,高级工程师,研究方向为交通土建工程施工技术。
  • 基金资助:
    中铁一局集团有限公司技术研发项目(2017A-043)

Numerical Simulation of Dewatering for an Underground Combined Utility Pipe Gallery Construction

ZENG Fanfu   

  1. (China Railway First Bureau Group Xiamen Construction Engineering Co. Ltd., Xiamen 361000)
  • Received:2020-04-27 Revised:2020-05-12 Online:2021-08-31 Published:2021-08-19

摘要: 为了解不同降水设计参数下综合管廊基坑的降水效果,以平潭地下综合管廊工程为例,借助PLAXIS 3D岩土有限元程序建立三维数值模型,模拟综合管廊基坑降水,研究不同降水井间距条件下地下水压力分布、地层沉降变形情况,并对降水井抽水量随时间的变化以及降水井间距变化展开分析。研究结果表明,基坑下方存在约4 m厚的淤泥质土层,形成了较好的隔水层,且止水帷幕穿过该隔水层减弱了坑内外水力联系,由于缺乏补给,坑内地下水位能够较快地降至设计标高;当仅进行降水时,坑内地层产生固结沉降,围护墙会随之发生侧移,导致坑外地层沉降;降水井抽水量随时间的变化呈现出先快速下降后逐渐稳定的趋势;当存在封闭的隔水空间时,坑内水位降至设计标高所需的最小时间与降水井间距近似呈线性变化关系。


关键词: 综合管廊, 数值模拟, 基坑降水, 降水井间距, 降水井抽水量

Abstract: This paper presents a case history of dewatering of an underground combined utility pipe galley construction in Pingtan City. In order to evaluate the dewatering effect under different dewatering design parameters, a three-dimensional numerical model of dewatering during the excavation was established by using commercial finite element method software PLAXIS. In the numerical analysis, the groundwater pressure distribution with different dewatering well spacing, soil layer deformation, variation of groundwater extraction volume with time and dewatering well spacing, are investigated. The results indicate that, the mucky clay layer that lays four (4) meters below the bottom of the excavation serves as a good aquitard layer and the cut-off wall is penetrated into this soil layer so that the connectivity of groundwater between the excavated area and the surrounding area has been effectively reduced. Due to lacking of the groundwater recharging, the groundwater level inside the excavated area could be quickly reach the design groundwater level. The consolidation induced settlement in the cohesive layer inside the excavated area occurs during the dewatering process and the lateral deflection in the excavation supporting structures also occurs so that the ground subsidence behind the supporting structure also consequently induced; The groundwater extraction volume with time pattern shows that a large quantity initially and the extraction volume reduces with time. Under the constraint of the aquitard layer, the time required to reach the design groundwater level has a linear relationship with the pump well spacing.

Key words: Comprehensive Utility Pipe Gallery, Numerical Simulation, Excavation Dewatering, Dewatering Well Spacing, Groundwater Extraction Volume

中图分类号: