某水电站坝址区工程地质条件评价

王建华1, 王耿2, 张茂军3   

  1. (1.秭归县公路管理局,湖北秭归 443600; 2.宜昌市公路管理局,湖北宜昌 443000; 3.枝江市公路管理段,湖北枝江 443200)
  • 收稿日期:2011-03-26 出版日期:2011-11-15 发布日期:2012-01-13
  • 作者简介:王建华,工程师。

Dam Site Engineering Geological Evaluation in Hydropower Station

WANG  Jian  hua1, WANG  Geng2, ZHANG  Mao  jun3   

  1. (1. Zigui Highway Administration Bureau, Zigui Hubei  443600; 
    2. Yichang Highway Administration Bureau, Yichang Hubei  443000; 
    3. Zhijiang Highway Administration Bureau, Zhijiang Hubei  443200, China)
  • Received:2011-03-26 Online:2011-11-15 Published:2012-01-13

摘要: 兴山县毛家河水电站坝址区的工程地质条件及评价关系到水电站的安全、建设周期、工程造价等诸多方面,是水电站建设勘察工作的重要环节,必须予以重视。工程地质条件评价有助于论证选址的合理性。

关键词: 毛家河水电站, 工程地质条件, 评价

Abstract: The engineering geological condition and evaluation of dam site  is the key in the survey of Maojiehe hydropower station construction, which plays an important role for its security, construction period and cost.